The elephant in the corner
Why do so many IC design teams commit to development schedules they know are not possible to meet? I ask this question because it's such a common occurrence in the semiconductor industry. (Don't read this article if you never miss schedules.)
To read the full article, click here
Related Semiconductor IP
- Ultra-Low-Power LPDDR3/LPDDR2/DDR3L Combo Subsystem
- Parameterizable compact BCH codec
- 1G BASE-T Ethernet Verification IP
- Network-on-Chip (NoC)
- Microsecond Channel (MSC/MSC-Plus) Controller
Related Blogs
- Imagination and Renesas Redefine the Role of the GPU in Next-Generation Vehicles
- Half of the Compute Shipped to Top Hyperscalers in 2025 will be Arm-based
- Portable Stimulus: The Next Big Leap In SoC Verification
- Vision-Language Models (VLM) – the next big thing in AI?
Latest Blogs
- Physical AI at the Edge: A New Chapter in Device Intelligence
- Rivian’s autonomy breakthrough built with Arm: the compute foundation for the rise of physical AI
- AV1 Image File Format Specification Gets an Upgrade with AVIF v1.2.0
- Industry’s First End-to-End eUSB2V2 Demo for Edge AI and AI PCs at CES
- Integrating Post-Quantum Cryptography (PQC) on Arty-Z7