Wind River real-time OS added to ARC configurable core
Wind River real-time OS added to ARC configurable core
By Peter Clarke, EE Times
February 5, 2001 (5:36 a.m. EST)
URL: http://www.eetimes.com/story/OEG20010202S0054
LONDON The VxWorks real-time operating system (RTOS) and Tornado development environment from Wind River Systems Inc. (Alameda, Calif.) have both been ported to the ARC 32-bit user-configurable processor core from ARC Cores Ltd. (Elstree, England). Wind River is also allowing ARC Cores to bundle the run-time license for VxWorks with the ARC processor, thereby providing licensees with a single source for hardware and software. "We want to ensure that our customers receive a quality RTOS and development tools from the industry's leader, Wind River, and that they continue to enjoy the freedom to configure their specific features in record time," said Jim Turley, senior vice president of marketing at ARC Cores. ARC claims that special hooks have been added to the VxWorks and Tornado to allow developers to modify and extend the ARC processor while using Wind River's tools. This is already supported in ARC's C language compiler, which allows a dditional hardware and instructions to be added to the processor core.
Related Semiconductor IP
- HBM4 PHY IP
- eFuse Controller IP
- Secure Storage Solution for OTP IP
- Ultra-Low-Power LPDDR3/LPDDR2/DDR3L Combo Subsystem
- MIPI D-PHY and FPD-Link (LVDS) Combinational Transmitter for TSMC 22nm ULP
Related News
- Wind River to roll DSP real-time OS
- Xilinx, Wind River team on programmable platform
- Wind River RTOS deployed in experimental aircraft
- Wind River, Rockwell team up on industrial Ethernet
Latest News
- Impinj and EM Microelectronic Announce Gen2X Licensing Agreement
- LTSCT and Andes Technology Sign Strategic IP Licensing Master Agreement to accelerate RISC-V Based Advanced Semiconductor Solutions
- Global Semiconductor Sales Increase 29.8% Year-to-Year in November
- BAE Systems Licenses Time Sensitive Networking (TSN) Ethernet IP Cores from CAST
- HBM4 Mass Production Delayed to End of 1Q26 By Spec Upgrades and Nvidia Strategy Adjustments