TSMC shuns high-NA EUV lithography
By Peter Clarke, eeNews Europe | April 29, 2025
Foundry TSMC does not need to use high-NA extreme ultraviolet lithography tools for the manufacture of chips on its A14 (1.4nm) process according to reports from the TSMC North America Technology Symposium.
The company introduced the A14 process at the symposium saying it is expected to enter production in 2028. It has previously been stated that an A16 process due to appear late 2026 and that too does not require a high-NA EUVL tool.
To read the full article, click here
Related Semiconductor IP
- 1.8V/3.3V I/O library with ODIO and 5V HPD in TSMC 16nm
- 1.8V/3.3V I/O Library with ODIO and 5V HPD in TSMC 12nm
- 1.8V to 5V GPIO, 1.8V to 5V Analog in TSMC 180nm BCD
- 1.8V/3.3V GPIO Library with HDMI, Aanlog & LVDS Cells in TSMC 22nm
- Specialed 20V Analog I/O in TSMC 55nm
Related News
- TSMC and Synopsys Bring Breakthrough NVIDIA Computational Lithography Platform to Production
- TSMC Says Immersion Lithography Nearly Production Ready
- MAPPER and TSMC Take Next Step in Exploring Multiple E-beam Lithography for IC Manufacturing at 22 nanometer node and Beyond
- IMEC presents functional 22nm SRAM cells fabricated using EUV technology
Latest News
- IC’Alps joins Intel Foundry Accelerator program as Value Chain Alliance (VCA) and Design Services Alliance (DSA) partner
- Arteris Joins Intel Foundry Accelerator Ecosystem Alliance Program to Support Advanced Semiconductor Designs
- TSMC shuns high-NA EUV lithography
- SkyeChip Joins Intel Foundry Accelerator IP Alliance
- Weebit Nano Q3 FY25 Quarterly Activities Report