TSMC Expansion in Arizona to Target 3-nm Node
By Alan Patterson, EETimes (November 14, 2022)
Taiwan Semiconductor Manufacturing Co. (TSMC) announced this week that it’s building the factory shell for a possible second fab at its Arizona site. The world’s top chipmaker has already committed to a $12 billion investment for its 5-nm fab in Arizona.
In an email to EE Times, the company said it is “now constructing” a building to potentially serve as a second fab in Arizona that would help achieve greater cost effectiveness at the new site.
TSMC has led a wave of new fab investments in the U.S. as part of a national effort to rebuild the domestic semiconductor industry centered around the CHIPS Act. When the first TSMC Arizona fab starts production in 2024, it will produce 5-nm chips—the most advanced in the U.S.
To read the full article, click here
Related Semiconductor IP
- Process/Voltage/Temperature Sensor with Self-calibration (Supply voltage 1.2V) - TSMC 3nm N3P
- 25MHz to 4.0GHz Fractional-N RC PLL Synthesizer on TSMC 3nm N3P
- USB 4.0 V2 PHY - 4TX/2RX, TSMC N3P , North/South Poly Orientation
- TSMC CLN5FF GUCIe LP Die-to-Die PHY
- Flipchip 1.8V/3.3V I/O Library with ESD-hardened GPIOs in TSMC 12nm FFC/FFC+
Related News
- TSMC Arizona and U.S. Department of Commerce Announce up to US$6.6 Billion in Proposed CHIPS Act Direct Funding, the Company Plans Third Leading-Edge Fab in Phoenix
- Alphawave Semi Launches Industry's First 3nm UCIe IP with TSMC CoWoS Packaging
- Unveiling the Availability of Industry's First Silicon-Proven 3nm, 24Gbps UCIe™ IP Subsystem with TSMC CoWoS® Technology
- Chips&Media Secures Access to TSMC 3nm Library
Latest News
- RAAAM Memory Technologies announces $17.5M Series A investment led by NXP Semiconductors to bring its innovative on-chip memory solution to mass production
- SEMI Reports Worldwide Silicon Wafer Shipments Increase 3% Year-on-Year in Q3 2025
- Logic Fruit Technologies Appoints Sunil Kar as President & CEO to Accelerate Global Growth
- EnSilica plc - Audited Results for the Year Ended 31 May 2025
- Thalia Design Automation announces AMALIA Platform release 25.3 qualified for advanced process nodes down to 4nm