Tower Semiconductor plans capacity investment
Peter Clarke, EE Times
(05/11/2006 8:51 AM EDT)
MUNICH, Germany — Foundry chip maker Tower Semiconductor Ltd. is looking to raise money to invest in equipment for Fab 2, its 200-mm wafer fab and is considering its strategy for 90-nm production.
Tower (Migdal Haemek, Israel) needs to spend between about $100 million and $150 million to bring in semiconductor production equipment to get it to breakeven, according to Rafi Nave, chief technology officer of Tower. Nave was attending the International Semiconductor Executives Forum organized by the Fabless Semiocnductor Association and the Institution of Engineering and Technology, here.
The fab is currently capable of about 15,000 wafer starts per month but is getting close to running at full capacity, Nave told EE Times. “25,000 wafer starts per month is breakeven,” Nave said. He added that with Tower’s current configuration of equipment each 1000 wafer starts per month requires spending of between $9 million and $18 million depending on the mix of second-hand or new equipment.
Fab 2 is mainly producing 0.18-micron CMOS circuits but the company is starting 0.13-micron processing next month with a prototype for a key customer, Nave said. Moving to 0.13-micron and the higher price that the technology can command should also help Tower get into the black.
(05/11/2006 8:51 AM EDT)
MUNICH, Germany — Foundry chip maker Tower Semiconductor Ltd. is looking to raise money to invest in equipment for Fab 2, its 200-mm wafer fab and is considering its strategy for 90-nm production.
Tower (Migdal Haemek, Israel) needs to spend between about $100 million and $150 million to bring in semiconductor production equipment to get it to breakeven, according to Rafi Nave, chief technology officer of Tower. Nave was attending the International Semiconductor Executives Forum organized by the Fabless Semiocnductor Association and the Institution of Engineering and Technology, here.
The fab is currently capable of about 15,000 wafer starts per month but is getting close to running at full capacity, Nave told EE Times. “25,000 wafer starts per month is breakeven,” Nave said. He added that with Tower’s current configuration of equipment each 1000 wafer starts per month requires spending of between $9 million and $18 million depending on the mix of second-hand or new equipment.
Fab 2 is mainly producing 0.18-micron CMOS circuits but the company is starting 0.13-micron processing next month with a prototype for a key customer, Nave said. Moving to 0.13-micron and the higher price that the technology can command should also help Tower get into the black.
To read the full article, click here
Related Semiconductor IP
- 5G-NTN Modem IP for Satellite User Terminals
- AXI-S Protocol Layer for UCIe
- HBM4E Controller IP
- 14-bit 12.5MSPS SAR ADC - Tower 65nm
- 5G-Advanced Modem IP for Edge and IoT Applications
Related News
- Samsung Electronics Unveils Plans for 1.4nm Process Technology and Investment for Production Capacity at Samsung Foundry Forum 2022
- TowerJazz Expected to Nearly Double Production Capacity with Proposed Acquisition of Micron Technology Wafer Manufacturing Plant in Japan
- Japanese Ministry of Economy, Trade and Industry has Approved Grants to TowerJazz for its Cap-Ex Investment Plan
- U.S. to Hold Over 20% of Advanced Semiconductor Capacity by 2030, TSMC Expands Investment to US$165 Billion, Says TrendForce
Latest News
- OpenTitan Ships in Chromebooks: First Production Deployment
- Breker Verification Systems Adds RISC‑V Industry Expert Larry Lapides to its Advisory Board
- Weebit Nano’s ReRAM Selected for Korean National Compute-in-Memory Program
- Marvell Extends ZR/ZR+ Leadership with Industry-first 1.6T ZR/ZR+ Pluggable and 2nm Coherent DSPs for Secure AI Scale-across Interconnects
- BrainChip Announces Neuromorphyx as Strategic Customer and Go-to-Market Partner for AKD1500 Neuromorphic Processor