Survey shows SoC design data management is mission critical
Shiv Sikand, IC Manage
EETimes (10/22/2010 12:02 PM EDT)
Nearly half (47 percent) of IC design engineering and CAD management indicated that design data management issues had caused design and tapeout delays for their organizations. The average delay cited was almost 3 workweeks (14 days).
This is one of the findings of a blind, worldwide survey of 426 IC design professionals on Global SoC Design Management. The majority of the respondents (53 percent) held engineering and CAD management positions. The remaining respondents included digital, full custom and FPGA designers (32 percent), verification engineers (8 percent), and software and firmware developers (7 percent).
To read the full article, click here
Related Semiconductor IP
- Root of Trust (RoT)
- Fixed Point Doppler Channel IP core
- Multi-protocol wireless plaform integrating Bluetooth Dual Mode, IEEE 802.15.4 (for Thread, Zigbee and Matter)
- Polyphase Video Scaler
- Compact, low-power, 8bit ADC on GF 22nm FDX
Related White Papers
- New Power Management IP Solution Can Dramatically Increase SoC Energy Efficiency
- System-on-chip (SoC) design is all about IP management
- Evaluating Data Management Software
- Take control of design data management
Latest White Papers
- Reimagining AI Infrastructure: The Power of Converged Back-end Networks
- 40G UCIe IP Advantages for AI Applications
- Recent progress in spin-orbit torque magnetic random-access memory
- What is JESD204C? A quick glance at the standard
- Open-Source Design of Heterogeneous SoCs for AI Acceleration: the PULP Platform Experience