Avoiding Redundant Simulation Cycles for your UVM VIP with a Simple Save-Restore Strategy
In many verification environments, we reuse the same configuration cycles across different testcases. These cycles may involve writing and reading from different configuration and status registers, loading program memories, and other similar tasks to set up a DUT for its targeted stimulus. In many such environments, the time taken during these configuration cycles is very long. Also, there is a lot of redundancy as verification engineers have to run the same set of verified configuration cycles for different testcases leading to a loss in productivity. This is especially true for complex verification environments with multiple interfaces which require different components to be configured.
To read the full article, click here
Related Semiconductor IP
- USB 20Gbps Device Controller
- AGILEX 7 R-Tile Gen5 NVMe Host IP
- 100G PAM4 Serdes PHY - 14nm
- Bluetooth Low Energy Subsystem IP
- Multi-core capable 64-bit RISC-V CPU with vector extensions
Related Blogs
- Running X-Propagation with Low-Power Simulation
- Interactive Debugging: Reduce Your Simulation Debug Turn-Around-Time
- Unlock early software development for custom RISC-V designs with faster simulation
- Analog Bits Steals the Show with Working IP on TSMC 3nm and 2nm and a New Design Strategy
Latest Blogs
- From guesswork to guidance: Mastering processor co-design with Codasip Exploration Framework
- Enabling AI Innovation at The Far Edge
- Unleashing Leading On-Device AI Performance and Efficiency with New Arm C1 CPU Cluster
- The Perfect Solution for Local AI
- UA Link vs Interlaken: What you need to know about the right protocol for AI and HPC interconnect fabrics