Avoiding Redundant Simulation Cycles for your UVM VIP with a Simple Save-Restore Strategy
In many verification environments, we reuse the same configuration cycles across different testcases. These cycles may involve writing and reading from different configuration and status registers, loading program memories, and other similar tasks to set up a DUT for its targeted stimulus. In many such environments, the time taken during these configuration cycles is very long. Also, there is a lot of redundancy as verification engineers have to run the same set of verified configuration cycles for different testcases leading to a loss in productivity. This is especially true for complex verification environments with multiple interfaces which require different components to be configured.
To read the full article, click here
Related Semiconductor IP
- Flexible Pixel Processor Video IP
- Complex Digital Up Converter
- Bluetooth Low Energy 6.0 Digital IP
- Verification IP for Ultra Ethernet (UEC)
- MIPI SWI3S Manager Core IP
Related Blogs
- Running X-Propagation with Low-Power Simulation
- Interactive Debugging: Reduce Your Simulation Debug Turn-Around-Time
- Unlock early software development for custom RISC-V designs with faster simulation
- Analog Bits Steals the Show with Working IP on TSMC 3nm and 2nm and a New Design Strategy
Latest Blogs
- CNNs and Transformers: Decoding the Titans of AI
- How is RISC-V’s open and customizable design changing embedded systems?
- Imagination GPUs now support Vulkan 1.4 and Android 16
- From "What-If" to "What-Is": Cadence IP Validation for Silicon Platform Success
- Accelerating RTL Design with Agentic AI: A Multi-Agent LLM-Driven Approach