When countries rush to secure the first 450mm fab
Will there be a tipping point at which chip companies and governments rush to build the first 450mm fab?
For the past few years, the debate on 450mm has been on whether the chip industry wnts it, whether the equipment industry wants it, whether it will reduce chip cost and who will fund it.
To read the full article, click here
Related Semiconductor IP
- HBM4 PHY IP
- Ultra-Low-Power LPDDR3/LPDDR2/DDR3L Combo Subsystem
- HBM4 Controller IP
- IPSEC AES-256-GCM (Standalone IPsec)
- Parameterizable compact BCH codec
Related Blogs
- Support For European 450mm Fab Strengthening
- Advanced Fab Capacity Utilisation Tops 90%
- Fab allocation back on the agenda
- Is 450mm A Dead Duck?
Latest Blogs
- ReRAM in Automotive SoCs: When Every Nanosecond Counts
- AndeSentry – Andes’ Security Platform
- Formally verifying AVX2 rejection sampling for ML-KEM
- Integrating PQC into StrongSwan: ML-KEM integration for IPsec/IKEv2
- Breaking the Bandwidth Barrier: Enabling Celestial AI’s Photonic Fabric™ with Custom ESD IP on TSMC’s 5nm Platform