When countries rush to secure the first 450mm fab
Will there be a tipping point at which chip companies and governments rush to build the first 450mm fab?
For the past few years, the debate on 450mm has been on whether the chip industry wnts it, whether the equipment industry wants it, whether it will reduce chip cost and who will fund it.
To read the full article, click here
Related Semiconductor IP
- Ultra-Low-Power LPDDR3/LPDDR2/DDR3L Combo Subsystem
- Parameterizable compact BCH codec
- 1G BASE-T Ethernet Verification IP
- Network-on-Chip (NoC)
- Microsecond Channel (MSC/MSC-Plus) Controller
Related Blogs
- Support For European 450mm Fab Strengthening
- Advanced Fab Capacity Utilisation Tops 90%
- Fab allocation back on the agenda
- Is 450mm A Dead Duck?
Latest Blogs
- Physical AI at the Edge: A New Chapter in Device Intelligence
- Rivian’s autonomy breakthrough built with Arm: the compute foundation for the rise of physical AI
- AV1 Image File Format Specification Gets an Upgrade with AVIF v1.2.0
- Industry’s First End-to-End eUSB2V2 Demo for Edge AI and AI PCs at CES
- Integrating Post-Quantum Cryptography (PQC) on Arty-Z7