When countries rush to secure the first 450mm fab
Will there be a tipping point at which chip companies and governments rush to build the first 450mm fab?
For the past few years, the debate on 450mm has been on whether the chip industry wnts it, whether the equipment industry wants it, whether it will reduce chip cost and who will fund it.
To read the full article, click here
Related Semiconductor IP
- LPDDR6/5X/5 PHY V2 - Intel 18A-P
- ML-KEM Key Encapsulation & ML-DSA Digital Signature Engine
- MIPI SoundWire I3S Peripheral IP
- ML-DSA Digital Signature Engine
- P1619 / 802.1ae (MACSec) GCM/XTS/CBC-AES Core
Related Blogs
- Support For European 450mm Fab Strengthening
- Advanced Fab Capacity Utilisation Tops 90%
- Fab allocation back on the agenda
- Is 450mm A Dead Duck?
Latest Blogs
- Why What Where DIFI and the new version 1.3
- ML-DSA explained: Quantum-Safe digital Signatures for secure embedded Systems
- Efficiency Defines The Future Of Data Movement
- Why Standard-Cell Architecture Matters for Adaptable ASIC Designs
- ML-KEM explained: Quantum-safe Key Exchange for secure embedded Hardware