Intel 14nm Delayed?
One of the more interesting pieces of information I overheard at SEMICON West earlier this month was that Intel 14nm was delayed. This rumor came from the semiconductor equipment manufacturers and they would know. What I was told is that the Intel 14nm process has not left the OR development facility to be replicated exactly in the OR and AZ fabs.
Process move-in is an important milestone to product launch of course. 14nm move-in was supposed to happen in Q3 but it did not. I got an update this week and was told it would “probably” not happen until Q1. The speculation is that it is a “qualification delay”.
To read the full article, click here
Related Semiconductor IP
- MIPI SoundWire I3S Peripheral IP
- Post-Quantum ML-KEM IP Core
- MIPI SoundWire I3S Manager IP
- eDP 2.0 Verification IP
- Gen#2 of 64-bit RISC-V core with out-of-order pipeline based complex
Related Blogs
- Intel Really is Delaying 14nm Move-in. 450mm is Slipping Too. EUV, who knows?
- Yes, Intel 14nm Really is Delayed...And They Lost $600M on Mobile
- Intel 14nm versus Samsung 14nm
- Intel Shutters 14nm Fab
Latest Blogs
- ML-KEM explained: Quantum-safe Key Exchange for secure embedded Hardware
- Rivos Collaborates to Complete Secure Provisioning of Integrated OpenTitan Root of Trust During SoC Production
- From GPUs to Memory Pools: Why AI Needs Compute Express Link (CXL)
- Verification of UALink (UAL) and Ultra Ethernet (UEC) Protocols for Scalable HPC/AI Networks using Synopsys VIP
- Enhancing PCIe6.0 Performance: Flit Sequence Numbers and Selective NAK Explained