Intel 14nm Delayed?
One of the more interesting pieces of information I overheard at SEMICON West earlier this month was that Intel 14nm was delayed. This rumor came from the semiconductor equipment manufacturers and they would know. What I was told is that the Intel 14nm process has not left the OR development facility to be replicated exactly in the OR and AZ fabs.
Process move-in is an important milestone to product launch of course. 14nm move-in was supposed to happen in Q3 but it did not. I got an update this week and was told it would “probably” not happen until Q1. The speculation is that it is a “qualification delay”.
To read the full article, click here
Related Semiconductor IP
- nQrux® Root of Trust IP
- AXI to UCIe Bridge IP
- UCIe 2.x Controller IP
- SWI3S (SoundWire I3S Interface) Peripheral Controller Core IP
- OpenTitan-based RISC-V Secure Element
Related Blogs
- Intel Really is Delaying 14nm Move-in. 450mm is Slipping Too. EUV, who knows?
- Yes, Intel 14nm Really is Delayed...And They Lost $600M on Mobile
- Intel 14nm versus Samsung 14nm
- Intel Shutters 14nm Fab
Latest Blogs
- From Bug Hunting to Engineering Methodology: Lessons from AI-Driven Development
- Manufacturing Intelligence: Turning EDA Data into Trusted Action
- Execute-in-Place: Getting More from Embedded NVM
- Rethinking RTL flows with AI-driven hybrid formal verification
- Arm and NVIDIA: Building the trusted compute foundation for the agentic AI era