"So, when will you be done with your design?"
Jeroen Fonderie, Touchstone Semiconductor
EDN (March 4, 2013)
Not exactly the question a typical design engineer is looking forward to. You’re at the start of a new project and it is time to commit to a development schedule. Now what? Your first instinct is to be vague. Use verbs like “should” and “hope” and lots of conditional statements. But you know that’s not going to fly. You can give your best estimate. But you’re usually too optimistic and then you will get yelled at when you don’t meet that commitment.
Or you can pad the heck out of it. At least that way you know you will not be bothered for many weeks. But now your manager and your peers may start to see you as a sandbagger whose input is not to be taken seriously. So what is the best way to come up with a schedule for the design phase of your project?
To read the full article, click here
Related Semiconductor IP
- DSP-Based 112G SerDes
- XTAL oscillator in TSMC-7nm
- GPU
- V-by-One Verification IP
- AI model compression IP
Related Articles
- Add Security And Supply Chain Trust To Your ASIC Or SoC With eFPGAs
- 7 warning signs that you should be concerned about your IP provider
- EDA in the Cloud Will be Key to Rapid Innovative SoC Design
- Implementing Secure Boot in Your Next Design
Latest Articles
- SEAM-V: A Hybrid-Decoupled RISC-V Vector Processor with Backend-Visible EP Context for Sustained Vector Throughput
- New Number Formats for FFT IP Cores in Optical OFDM Transceivers
- Reducing Power Consumption of Embedded Dynamic Memories with ECCs
- NIFA: Nonlinear IMC enhanced FPGA for efficient ML inference
- A 32-channel event-based bio-signal analog front-end with adaptive delta and pulse frequency encoding