The ripple effect
Ron Collett, Numetrics
7/29/2010 5:25 AM EDT
As a senior product-development manager, you’ve no doubt seen the ripple effect: Your project is humming along and it’s time to add engineers on a crucial part of the design. But wait! The engineers you need are tied up on another project whose schedule has slipped, and they can’t be moved over to yours. What’s worse is when the manager on that project is not sure when they’ll be free.
You’re frustrated and suddenly stalled on the freeway and what happens in larger organizations is chillingly clear: a chain-reaction crash that creates incredible chaos across the R&D group.
To read the full article, click here
Related Semiconductor IP
- Secure Boot Loader
- Memory Subsystem
- 4/8-bit mixed-precision NPU IP
- Compiler-centric single-core LPU
- SMC 2nm 1V8 ESD Power Clamp – Low Leakage
Related Articles
- Testing PSRR with High-Frequency Ripple
- Antenna Effect in 16nm Technology Node
- Retargeting IP -> Effective designs eye next generation
- Producing an Effective WLAN Prototyping Platform
Latest Articles
- Versat-AI: An ONNX-to-SoC Compiler for Model-Agnostic CGRA Edge Inference
- HyNoC: A Hybrid Circuit-Switch/Wormhole Network-on-Chip for Distributed VLIW Computing on FPGA
- Hybrid ASIC-FPAA Fabric for Performance Security Trade-off
- A Centralized Performance Monitoring Architecture for Heterogeneous Multicore SoCs
- A Low-Latency ASIC Architecture for Real-Time Line Segment Detection