TSMC Raises The Semiconductor Bar With 450mm!
During the most recent conference call, TSMC not only beat revised estimates and announced record spending levels for 2011, Morris Chang also officially announced that a 450mm fab (Fab 12 Phase VI) is currently in the planning stages with target production @ 20nm in 2015. This is HUGE!
According to Morris Chang:
To read the full article, click here
Related Semiconductor IP
- Adaptive Voltage Scaling (AVS) Bus Target IP
- Adaptive Voltage Scaling (AVS) Bus Host Controller
- NoC Interconnect IP Generator
- Over-Voltage Lockout (OVLO) IP
- Verification IP for Universal Chiplet Interconnect Express (UCIe) up to 3.0
Related Blogs
- TSMC on 450mm transition: Lithography key!
- Is 450mm A Dead Duck?
- The Riddle Of 450mm
- What's happening on the 450mm wafer front?
Latest Blogs
- Building the engine behind Arm’s silicon shift
- M31 High-Speed and Long-Channel MIPI C/D-PHY Solution on TSMC N3P/N3C
- Understanding security certification and how analog IP can help
- Embedded Security explained: Secure boot for embedded systems
- World's First Standards-Compliant 112G PHY IP for Linear Optics: A Turning Point for AI Interconnects