Survey shows SoC design data management is mission critical
Shiv Sikand, IC Manage
EETimes (10/22/2010 12:02 PM EDT)
Nearly half (47 percent) of IC design engineering and CAD management indicated that design data management issues had caused design and tapeout delays for their organizations. The average delay cited was almost 3 workweeks (14 days).
This is one of the findings of a blind, worldwide survey of 426 IC design professionals on Global SoC Design Management. The majority of the respondents (53 percent) held engineering and CAD management positions. The remaining respondents included digital, full custom and FPGA designers (32 percent), verification engineers (8 percent), and software and firmware developers (7 percent).
To read the full article, click here
Related Semiconductor IP
- TSMC 7nm 0V75 / 0V9 ESD Local Clamp – Low Cap
- TSMC 65nm 3V3 ESD Local Clamp – Rad Hard
- TSMC 5nm 1V8, 1.2V and 0.9V ESD Local Protection – Low Cap
- TSMC 3nm 3V3 ESD Local Clamp
- TSMC 3nm 1V2 ESD Local Clamp – Low Capacitance
Related Articles
- System-on-chip (SoC) design is all about IP management
- Evaluating Data Management Software
- Take control of design data management
- Standardizing data interchanges among design tools in the ECU development process: Pt. 1 - Models, formats, and data management
Latest Articles
- LACE: Large Language Model Aided Multi-Agent Framework for Agile RISC-V Instruction Extension
- A Process-Aware Hybrid Si/IGO Monolithic-3D 6T SRAM with BEOL Pass-Gates for the 2nm Node
- Automated Estimation of MBIST Area and Test Time in Heterogeneous Memory IPs via Stacked Ensemble Framework
- VIPER: Architecture-Aware Performance Modeling for Processing-in-Memory Design-Space Exploration
- CTTE: An Open Dual-Protocol RISC-V Trace Encoder for N-Trace and E-Trace