Developing an automotive electrical distribution system Part 1: System design
By Nigel Hughes, Mentor Graphics
February 21, 2007 - automotivedesignline.com
The electronic content of a modern car has become one of the key brand differentiators in the market place. Alongside the obvious problems in ensuring that the latest technologies are available to be included is making sure that the associated systems supporting deployment into the vehicle can be developed and integrated into the final production vehicle.
Any problems are compounded by the pressure of ever decreasing design cycle times. As can be seen from the graph below, cycles have now been reduced to between 24 and 18 months, with a clear goal for most OEMs to reduce this to 12 months by 2010. Within this cycle the electrical distribution system supporting the electronic content must be designed, validated, and deployed. Doing this is increasingly dependent on developing new processes and tools to support those processes.
In order to preserve a reasonable margin, automotive OEMs must also see that an appropriate return is gained from the technology, by specifying vehicle models with an appropriate set of options in order to support accurate pricing. Recently the market has witnessed a dramatic increase in the amount of optional content in vehicles. This trend pushes the need to make the latest technologies available, whilst ensuring basic car models are still available in an extremely price competitive market.
February 21, 2007 - automotivedesignline.com
The electronic content of a modern car has become one of the key brand differentiators in the market place. Alongside the obvious problems in ensuring that the latest technologies are available to be included is making sure that the associated systems supporting deployment into the vehicle can be developed and integrated into the final production vehicle.
Any problems are compounded by the pressure of ever decreasing design cycle times. As can be seen from the graph below, cycles have now been reduced to between 24 and 18 months, with a clear goal for most OEMs to reduce this to 12 months by 2010. Within this cycle the electrical distribution system supporting the electronic content must be designed, validated, and deployed. Doing this is increasingly dependent on developing new processes and tools to support those processes.

In order to preserve a reasonable margin, automotive OEMs must also see that an appropriate return is gained from the technology, by specifying vehicle models with an appropriate set of options in order to support accurate pricing. Recently the market has witnessed a dramatic increase in the amount of optional content in vehicles. This trend pushes the need to make the latest technologies available, whilst ensuring basic car models are still available in an extremely price competitive market.
To read the full article, click here
Related Semiconductor IP
- MACsec Engine optimized for 10Base-T1S/T1L applications
- Dual Port, Voltage Scaling Register File Compiler on GF22FDX+
- Single Port, Voltage Scaling, High Speed SRAM Memory Compiler on GF22FDX+
- I3C Full Controller / Target
- I3C HCI Host Controller
Related Articles
- Automotive System & Software Development Challenges - Part 1
- Providing memory system and compiler support for MPSoc designs: Memory Architectures (Part 1)
- Automotive System & Software Development Challenges - Part 2
- Providing memory system and compiler support for MPSoc designs: Compiler Support (Part 3)
Latest Articles
- Verify the Verifier: Specification-Grounded LLM Cross-Checking for Bugs That Escape UVM Scoreboards
- PULSAR-V: I/O-Aware Post-Update Attestation for RISC-V
- PVTSizing 2.0: A Fast and Reliable Analog Circuit Sizing Operator for Agentic EDA Workflows
- An Agentic Python Framework for LLM-Driven UVM Testbench Synthesis with Closed-Loop Compiler Feedback
- Reconfiguring System-Level Protection Through Bounded Delegation in RISC-V MCUs