Intel's Ivy Bridge delayed says senior executive
Sylvie Barak, EETimes
2/26/2012 6:28 PM EST
BARCELONA—A senior Intel Corp. executive has admitted that its next generation Ivy Bridge microprocessor will be delayed by around eight to 10 weeks to be launched in June.
Sean Maloney, executive vice-president of Intel and chairman of Intel China told the Financial Times that the 22-nm processor would now not be shipping in April as had widely been expected by analysts.
To read the full article, click here
Related Semiconductor IP
- Verification IP for C-PHY
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
Related News
- Intel Ivy Bridge CPUs may launch in March
- UBM TechInsights takes first look inside Intel's latest Ivy Bridge processor
- New PCI bridge and memory controller cores take connectivity to board level for user-customizable processor
- Altera builds on-chip bridge to link interfaces
Latest News
- JEDEC Advances DDR5 MRDIMM Ecosystem with New Memory Interface Logic and Expanded MRDIMM Roadmap
- Altera Brings Determinism to Physical AI Systems with Latest Release of FPGA AI Suite
- Mosaic SoC raises $3.8M to bring real-time spatial intelligence to every consumer device
- UMC Reports First Quarter 2026 Results
- Rambus Appoints Sumeet Gagneja as Chief Financial Officer