Intel Ivy Bridge CPUs may launch in March
Sylvie Barak, EETimes
10/21/2011 9:43 PM EDT
SAN FRANCISCO--Intel Corp.’s 22-nm Ivy Bridge CPUs will likely launch in March, one quarter later than originally planned, but well within Intel’s revised timeframe of “Spring 2012.”
Intel originally targeted late 2011 for Ivy Bridge, in time for launch at the annual Consumer Electronics Show in Las Vegas, but that timeframe had been pushed back by the firm owing to delays. Intel’s current Sandy Bridge generation of CPUs was unveiled at CES in January 2011.
To read the full article, click here
Related Semiconductor IP
- Verification IP for C-PHY
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
Related News
- Intel's Ivy Bridge delayed says senior executive
- UBM TechInsights takes first look inside Intel's latest Ivy Bridge processor
- New PCI bridge and memory controller cores take connectivity to board level for user-customizable processor
- Altera builds on-chip bridge to link interfaces
Latest News
- JEDEC Advances DDR5 MRDIMM Ecosystem with New Memory Interface Logic and Expanded MRDIMM Roadmap
- Altera Brings Determinism to Physical AI Systems with Latest Release of FPGA AI Suite
- Mosaic SoC raises $3.8M to bring real-time spatial intelligence to every consumer device
- UMC Reports First Quarter 2026 Results
- Rambus Appoints Sumeet Gagneja as Chief Financial Officer