Intel Ivy Bridge CPUs may launch in March
Sylvie Barak, EETimes
10/21/2011 9:43 PM EDT
SAN FRANCISCO--Intel Corp.’s 22-nm Ivy Bridge CPUs will likely launch in March, one quarter later than originally planned, but well within Intel’s revised timeframe of “Spring 2012.”
Intel originally targeted late 2011 for Ivy Bridge, in time for launch at the annual Consumer Electronics Show in Las Vegas, but that timeframe had been pushed back by the firm owing to delays. Intel’s current Sandy Bridge generation of CPUs was unveiled at CES in January 2011.
To read the full article, click here
Related Semiconductor IP
- Dual Channel 8b D/A Converter - TSMC T40ULP
- Dual Channel 12b D/A Converter - TSMC T40ULP+ESF3
- 8bit D/A Converter - TSMC 22nm ULP
- 12bit 2MSps A/D Converter - TSMC T22ULP
- TSMC 2nm 1V2 GPIO
Related News
- Intel's Ivy Bridge delayed says senior executive
- UBM TechInsights takes first look inside Intel's latest Ivy Bridge processor
- New PCI bridge and memory controller cores take connectivity to board level for user-customizable processor
- Altera builds on-chip bridge to link interfaces
Latest News
- Brite Semiconductor Releases 28nm High-Performance SAR ADC IP, Driving Upgrades for High-Speed Signal Chain Applications
- Synopsys Updates CXL IP Portfolio for AI-Era Infrastructure
- BrainChip Launches Symphony Community Akida Bundle For IBM’s Workload Management Solution
- StarIC Appoints Dr. Masum Hossain as Chief Technology Officer
- Andes Technology Empowers RISC-V Developers with Its New Streamlined IDE, RVBuilder