Could 450-mm wafers play away from the leading edge?
Peter Clarke, EETimes
1/20/2012 1:23 PM EST
LONDON – Many people have assumed that when the processing of integrated circuits on 450-mm diameter wafers comes, it will do so first for the most advanced digital manufacturing processes. The conventional wisdom runs that it will be Intel, or perhaps Samsung and TSMC, that will put down billions of dollars to gain the economies of scale that come with larger wafers. And they will do it to run their newest digital processes and most valuable chip designs.
That is the way it was for the initial transition to 300-mm wafers, and other transitions before it, with older fabs running smaller wafers naturally becoming the home for older legacy production.
But does it have to be that way?
To read the full article, click here
Related Semiconductor IP
- Verification IP for C-PHY
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
Related News
- Intel: 450-mm wafers must wait on 10-nm
- Nvidia calls for move to 450mm wafers
- Dresden fab could host 20-nm process, 450-mm wafers
- Companies Maximize 300mm, 200mm Wafers; Slow Progress on 450mm
Latest News
- JEDEC Advances DDR5 MRDIMM Ecosystem with New Memory Interface Logic and Expanded MRDIMM Roadmap
- Altera Brings Determinism to Physical AI Systems with Latest Release of FPGA AI Suite
- Mosaic SoC raises $3.8M to bring real-time spatial intelligence to every consumer device
- UMC Reports First Quarter 2026 Results
- Rambus Appoints Sumeet Gagneja as Chief Financial Officer