The best laid plans of mice and men
Last month on these pages I discussed "The elephant in the corner"–the wholly unrealistic IC development schedule nobody dares openly question. In truth, the situation is often much worse than I described. Usually it isn't just one elephant in the corner, there's a herd—a portfolio of projects. In fact, one of the most insidious problems of portfolio management is the failure to adequately verify that project plans are realistic. Because most R&D organizations lack a reliable verification capability, most portfolios end up in chaos—indeed, "the best laid (portfolio) plans of mice and men often go awry."
To read the full article, click here
Related Semiconductor IP
- Ultra Ethernet MAC & PCS 100G/200G/400G/800G
- Ethernet PCS 100G/200G/400G/800G/1.6T
- Ethernet MAC 100G/200G/400G/800G/1.6T
- Junction Over-Temperature Detector with Linear Centigrade-to-Voltage Output - X-FAB XT018
- Performance P570 Gen 3
Related Blogs
- Powering the Future of RF: Falcomm and GlobalFoundries at IMS 2025
- The Evolution of AI and ML- Enhanced Advanced Driver Systems
- MIPS and GlobalFoundries: Powering the Next Wave of Physical AI
- UEC-LLR: The Future of Loss Recovery in Ethernet for AI and HPC
Latest Blogs
- Inside the SiFive Performance™ P570 Gen 3: High Performance Efficiency for Next-Generation Consumer and Commercial Applications
- What the steam engine can teach us about modern chip design
- Automotive silicon in the era of AI, functional safety, and cybersecurity
- JPEG XS Officially Joins GenICam, The Machine Vision Standard Managed By EMVA
- Beyond PCIe Compliance: Why Stress Testing Is Crucial for Edge AI Deployments