Can Samsung Deliver As Promised?
Samsung’s aggressive marketing is starting to hit the fabless semiconductor ecosystem so we had all better be prepared. Samsung’s 2012 marketing budget exceeded $400M which probably beats the marketing budget of the entire fabless ecosystem! The question is, will the fabless semiconductor industry be easily swayed by Samsung’s clever marketing? Let’s take a look at their recent mailer and see:
Samsung is fueling the innovations that are changing the way we connect, interact, and benefit from technology. Our low-power, high-performance components and advanced process manufacturing are the foundation for your next leap in mobile products and the infrastructure that connects them. Connect with Samsung and stay abreast of our latest solutions.
This email talked about 14nm and getting ready for FinFET design.
To read the full article, click here
Related Semiconductor IP
- TSMC 7nm 0V75 / 0V9 ESD Local Clamp – Low Cap
- TSMC 65nm 3V3 ESD Local Clamp – Rad Hard
- TSMC 5nm 1V8, 1.2V and 0.9V ESD Local Protection – Low Cap
- TSMC 3nm 3V3 ESD Local Clamp
- TSMC 3nm 1V2 ESD Local Clamp – Low Capacitance
Related Blogs
- Is Toshiba Going Fabless?
- Qualcomm, AMD head top 25 fabless IC suppliers for 2009; Taiwan firms finish strong!
- Absolutely Fabless? Or Not So Fabulous?
- TSMC versus SAMSUNG
Latest Blogs
- Beyond Trusted: What the NSA’s New Guidance Means for Hardware Security
- A scalable, shader-programmable vector graphics GPU core for low-power MCUs
- Navigating ISO 26262 Part 11: A Guide for Semiconductor Architects
- Embedded Security explained: Digital signatures
- Hardware security verification must go beyond functional testing