R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
- TSMC 7nm 0V75 / 0V9 ESD Local Clamp – Low Cap
- TSMC 65nm 3V3 ESD Local Clamp – Rad Hard
- TSMC 5nm 1V8, 1.2V and 0.9V ESD Local Protection – Low Cap
- TSMC 3nm 3V3 ESD Local Clamp
- TSMC 3nm 1V2 ESD Local Clamp – Low Capacitance
Related Blogs
- The most important R&D performance metrics
- In search of best-in-class R&D organizations
- Intel Puts $1bn Into 450mm R&D; $3bn Into ASML Shares
- Eliminate Waste, Share IP, Raise Profitability, says eSilicon
Latest Blogs
- Beyond Trusted: What the NSA’s New Guidance Means for Hardware Security
- A scalable, shader-programmable vector graphics GPU core for low-power MCUs
- Navigating ISO 26262 Part 11: A Guide for Semiconductor Architects
- Embedded Security explained: Digital signatures
- Hardware security verification must go beyond functional testing