R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
- NPU IP
- JPEG XL Encoder
- I2C Master/Slave Controller Core
- NVMe Validation Test Suite
- Hybrid Memory Cube Verification IP
Related Blogs
- The most important R&D performance metrics
- In search of best-in-class R&D organizations
- Intel Puts $1bn Into 450mm R&D; $3bn Into ASML Shares
- Eliminate Waste, Share IP, Raise Profitability, says eSilicon
Latest Blogs
- Tape-Out Readiness Checklist: Engineering Decisions That Prevent Costly Respins
- How Cadence DSPs Put In-Cabin AI Audio On-Chip in SemiDrive's X10
- The Fastest Path to Scalable Photonic Systems: Using Proven IP for both PIC and EIC designs
- Building Trusted AI Agents from the Silicon Root of Trust
- Heterogeneous Computing in Space