R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
- MACsec Engine optimized for 10Base-T1S/T1L applications
- Dual Port, Voltage Scaling Register File Compiler on GF22FDX+
- Single Port, Voltage Scaling, High Speed SRAM Memory Compiler on GF22FDX+
- I3C Full Controller / Target
- I3C HCI Host Controller
Related Blogs
- The most important R&D performance metrics
- In search of best-in-class R&D organizations
- Intel Puts $1bn Into 450mm R&D; $3bn Into ASML Shares
- Eliminate Waste, Share IP, Raise Profitability, says eSilicon