R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
- 16-Bit xSPI PSRAM PHY
Related Blogs
- Throughput, not productivity, is what matters
- The most important R&D performance metrics
- Optimal team sizes for chip projects
- The politics of productivity
Latest Blogs
- AI in Design Verification: Where It Works and Where It Doesn’t
- PCIe 7.0 fundamentals: Baseline ordering rules
- Ensuring reliability in Advanced IC design
- A Closer Look at proteanTecs Health and Performance Management Solutions Portfolio
- Enabling Memory Choice for Modern AI Systems: Tenstorrent and Rambus Deliver Flexible, Power-Efficient Solutions