R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
- Chiplet Die-to-Die Interconnect IP Solution
- High speed MACsec Engine 100G/200G/400G/800G/1.6T
- Temperature/Voltage sensors
- AMBA Bus Host to eSPI Controller/Target
- AMBA Bus Host to eSPI Controller
Related Blogs
- Throughput, not productivity, is what matters
- The most important R&D performance metrics
- Optimal team sizes for chip projects
- The politics of productivity
Latest Blogs
- Cadence Achieves Successful Silicon Validation of 1st IP Test Chips on Intel 18A
- From Classical CAN and CAN FD to CAN XL: Functional Safety and Security for Next-Generation In-Vehicle Communication
- Accelerating Embedded Memory Performance with 16-bit xSPI PSRAM IP
- Why nonce reuse can break AES-GCM security in embedded systems
- PQSecure™-Agility Earns NIST CAVP Validation