R&D predictability: The path to profitability
Poor schedule predictability of IC development projects is the Achilles heel of semiconductor companies. It manifests itself as high schedule slip and is among the most important R&D metrics, measuring how well project schedules reflect reality. Most don't.
Companies traditionally view schedule slip not as a result of faulty project plans, but rather as a consequence of unforeseeable perturbations occurring during the development process. The picture is incomplete and inaccurate. Slip must also be viewed through the project planning lens, because many events labeled as unforeseeable can be fully contemplated in the project plan with proper modeling. The payoff is big—reliable plans, which is the path to profitability.
To read the full article, click here
Related Semiconductor IP
Related Blogs
- The most important R&D performance metrics
- In search of best-in-class R&D organizations
- Intel Puts $1bn Into 450mm R&D; $3bn Into ASML Shares
- Eliminate Waste, Share IP, Raise Profitability, says eSilicon
Latest Blogs
- Designing for What Comes Next in AI
- Secure boot on Efinix Titanium Ti60: Getting started with KiviBoot-Tiny
- How Long Does It Take to Port a New AI Model? Minutes Now, and Falling
- PCI Express Security and TEE Integration, Part 1 - Establishing Trust
- World Models at the Edge, in Real Time: V-JEPA 2.1 on the Quadric GPNPU