When countries rush to secure the first 450mm fab
Will there be a tipping point at which chip companies and governments rush to build the first 450mm fab?
For the past few years, the debate on 450mm has been on whether the chip industry wnts it, whether the equipment industry wants it, whether it will reduce chip cost and who will fund it.
To read the full article, click here
Related Semiconductor IP
- MIL-STD-1553 Controller IP
- UFS 5.x Device IP
- UCIe 3.x Controller IP
- Ethernet 800G PCS IP
- CHI to UCIe Bridge IP
Related Blogs
- Support For European 450mm Fab Strengthening
- Advanced Fab Capacity Utilisation Tops 90%
- Fab allocation back on the agenda
- Is 450mm A Dead Duck?
Latest Blogs
- CDM Dependence on Device Capacitance
- What the Cyber Resilience Act means for the future of chip design
- When Your IP Vendor Has Operated 150,000 Base Stations: Introducing Viettel Semiconductor
- Relationship between architecture and validation in system design
- The Post-Quantum Cryptography Mandate: Building Cryptographically Agile Systems for the Quantum Era