When countries rush to secure the first 450mm fab
Will there be a tipping point at which chip companies and governments rush to build the first 450mm fab?
For the past few years, the debate on 450mm has been on whether the chip industry wnts it, whether the equipment industry wants it, whether it will reduce chip cost and who will fund it.
To read the full article, click here
Related Semiconductor IP
- MACsec Engine optimized for 10Base-T1S/T1L applications
- Dual Port, Voltage Scaling Register File Compiler on GF22FDX+
- Single Port, Voltage Scaling, High Speed SRAM Memory Compiler on GF22FDX+
- I3C Full Controller / Target
- I3C HCI Host Controller
Related Blogs
- Support For European 450mm Fab Strengthening
- Advanced Fab Capacity Utilisation Tops 90%
- Fab allocation back on the agenda
- Is 450mm A Dead Duck?