450-mm fab schedule slips
Mark LaPedus, EETimes
1/24/2011 8:52 PM EST
SAN JOSE, Calif. – Despite a sudden surge in fab tool activity for the next-generation wafer size, 450-mm fabs will emerge later than sooner and the production target appears to have slipped.
This comes to no surprise to analysts, as the recent recession appears to have delayed 450-mm fab and tool investments. As reported, Intel, Samsung and TSMC have talked about having 450-mm prototype fabs by 2012. Intel Corp. is readying D1X, a 450-mm ''capable’’ fab. The new development fab in Oregon is slated for R&D startup in 2013.
To read the full article, click here
Related Semiconductor IP
- UALink PHY + Controller
- General Purpose Low-Dropout (LDO) - TSMC
- Camera Post-Processing IP
- DC-DC Split-Pi Boost-Buck Converter
- Deep learning accelerator
Related News
- SystemC reference manual running slightly behind schedule
- InterTrust Files Amendment to Solicitation/ Recommendation on Schedule 14D-9
- Cyclone Devices—Industry's Lowest-Cost FPGA Family—Shipping Ahead of Schedule
- Altera Receives Stratix II Wafers Ahead of Schedule
Latest News
- TAKUMI starts licensing new Warping IPs “TW270” and “TW290”
- Quintauris Announces Planned Leadership Transition
- CAST Licenses TCP/IP Hardware Stack Core for Keysight FieldFox Handheld Spectrum Analyzers
- Global Semiconductor Sales Increase 9.2% Month-to-Month in May
- «Made in Germany» Security Chip Serves as a Root of Trust for Connected Devices