450-mm fab schedule slips
Mark LaPedus, EETimes
1/24/2011 8:52 PM EST
SAN JOSE, Calif. – Despite a sudden surge in fab tool activity for the next-generation wafer size, 450-mm fabs will emerge later than sooner and the production target appears to have slipped.
This comes to no surprise to analysts, as the recent recession appears to have delayed 450-mm fab and tool investments. As reported, Intel, Samsung and TSMC have talked about having 450-mm prototype fabs by 2012. Intel Corp. is readying D1X, a 450-mm ''capable’’ fab. The new development fab in Oregon is slated for R&D startup in 2013.
To read the full article, click here
Related Semiconductor IP
- Source-synchronous die-to-die interface
- Parametric System-on-Chiplet IP core
- Parametric active-interposer IP core
- Parametric 64-bit dual-issue in-order processor
- Low-latency 2D mesh network-on-chip (NoC) IP core
Related News
- SystemC reference manual running slightly behind schedule
- InterTrust Files Amendment to Solicitation/ Recommendation on Schedule 14D-9
- Cyclone Devices—Industry's Lowest-Cost FPGA Family—Shipping Ahead of Schedule
- Altera Receives Stratix II Wafers Ahead of Schedule
Latest News
- AI Makes Formal Verification Practical
- Agile Analog provides ASPEED Technology with robust security and power IP for PQC ready Platform Root of Trust solution
- Kyocera Speeds SoC Design Time by Porting Entire AI Signal Chains to Quadric's Chimera GPNPU
- ChipAgents Collaborates with Renesas in AI-Native Chip Design
- MEMTECH announces MemoryProto, an FPGA memory prototype platform