Verification of the Lane Adapter FSM of a USB4 Router Design Is Not Simple
Verifying lane adapter state machine in a router design is quite an involved task and needs verification from several aspects including that for its link training functionality.
The diagram below shows two lane adapters connected to each other and each going through the link training process. Each training sub-state transition is contingent on conditions for both transmission and reception of relevant ordered sets needed for a transition. Until conditions for both are satisfied an adapter cannot transition to the next training sub-state.
As deduced from the lane adapter state machine section of USB4 specification, the reception condition for the next training sub-state transition is less strict than that of the transmission condition. For ex., for LOCK1 to LOCK2 transition, the reception condition requires only two SLOS symbols in a row being detected, while the transmission condition requires at least four complete SLOS1 ordered sets to be sent.
To read the full article, click here
Related Semiconductor IP
- Chiplet Die-to-Die Interconnect IP Solution
- High speed MACsec Engine 100G/200G/400G/800G/1.6T
- Temperature/Voltage sensors
- AMBA Bus Host to eSPI Controller/Target
- AMBA Bus Host to eSPI Controller
Related Blogs
- Design, Verification, and Software Development Decisions Require a Single Source of Truth
- USB4 Sideband Channel Is Not a Side Business
- Maximizing the Usability of Your Chip Development: Design with Flexibility for the Future
- Trust at the Core: A Deep Dive into Hardware Root of Trust (HRoT)
Latest Blogs
- Cadence Achieves Successful Silicon Validation of 1st IP Test Chips on Intel 18A
- From Classical CAN and CAN FD to CAN XL: Functional Safety and Security for Next-Generation In-Vehicle Communication
- Accelerating Embedded Memory Performance with 16-bit xSPI PSRAM IP
- Why nonce reuse can break AES-GCM security in embedded systems
- PQSecure™-Agility Earns NIST CAVP Validation