A Strategy to Verify an AXI/ACE Compliant Interconnect (2 of 4)
In the last post of this series, we focused on the first level of testing required for verifying an AXI/ACE Compliant Interconnect — Integration/Connectivity testing. In this post, we will focus on basic coherent transaction testing. We use the term basic to signify something that is a prerequisite before we move on to more advanced testing. Coherent transactions are a set of transactions used in the AXI/ACE protocol to perform load and store operations. Each of these transactions have a different set of response requirements from the Interconnect. Further, each of these transactions can be used in multiple configurations. We need to verify that the Interconnect works correctly for each of these transaction types. We will first give an overview of the protocol before moving on to a testing strategy for these.
To read the full article, click here
Related Semiconductor IP
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
- 16-Bit xSPI PSRAM PHY
Related Blogs
- When a Platform Provider Becomes a Competitor: Why Arm’s Silicon Strategy Changes the Incentives
- RISC-V: An Open Standard - Backed by a Global Community - to Enable Open Computing for All
- Three Smart Steps to Quickly Test a Register Map for Your Entire SoC
- Arm Ecosystem Collaborates on Standards to Enable a Thriving Chiplet Market
Latest Blogs
- AI in Design Verification: Where It Works and Where It Doesn’t
- PCIe 7.0 fundamentals: Baseline ordering rules
- Ensuring reliability in Advanced IC design
- A Closer Look at proteanTecs Health and Performance Management Solutions Portfolio
- Enabling Memory Choice for Modern AI Systems: Tenstorrent and Rambus Deliver Flexible, Power-Efficient Solutions