Navigating the challenges of manual IP design migrations
In semiconductor design, the migration of IP across different technology nodes is a complex but business critical process. This task, traditionally manual, involves a detailed analysis of source and target technologies, migration of schematics and testbenches, and iterative design adjustments to meet specific performance requirements for the final design layout.
The challenges of manual migration
The manual process is intricate and lengthy, taking weeks to months, depending on the complexity of the circuit and IPs involved. Designers must deeply understand circuit behavior across Process, Voltage, and Temperature (PVT) corners, and engage in extensive simulations and iterations to achieve the desired specifications.
Additionally, the rate at which new technology nodes are introduced is accelerating, with each new node introducing more design rule complexity, leading to higher development costs and greater pressure on engineering resources due to the additional time needed to manage the migration process.
A shortage of skilled engineers further complicates the situation, not only extending design timelines and inflating costs due to the premium on expert talent, but also putting companies at risk of falling behind in the fiercely competitive race to secure fab capacity.
To read the full article, click here
Related Semiconductor IP
- MACsec Engine optimized for 10Base-T1S/T1L applications
- Dual Port, Voltage Scaling Register File Compiler on GF22FDX+
- Single Port, Voltage Scaling, High Speed SRAM Memory Compiler on GF22FDX+
- I3C Full Controller / Target
- I3C HCI Host Controller
Related Blogs
- Securing RISC-V Third-Party IP: Enabling Comprehensive CWE-Based Assurance Across the Design Supply Chain
- Tape-out Risk in the Age of Edge AI: The Case for GPU IP
- The 5 Biggest Challenges in Modern SoC Design (And How to Solve Them)
- What the Cyber Resilience Act means for the future of chip design