Intel's Master-Plan
You can see why Intel decided to accept ASML's offer to invest in it -because the difference between the plans of Intel and TSMC on when to start 450mm production, and the plans of ASML on when to produce a 450mm lithographic machine is comical.
TSMC says it intends to start trial production on 450mm wafers in 2013-14 and to be in volume production in 2015-16.
Intel says it will be getting first generation 450mm tools in 2015 and will start making ICs on it. In 2016/2017 second generation 2 tools will be delivering real productivity and Intel will then start upgrading its existing fabs."
To read the full article, click here
Related Semiconductor IP
- MACsec Engine optimized for 10Base-T1S/T1L applications
- Dual Port, Voltage Scaling Register File Compiler on GF22FDX+
- Single Port, Voltage Scaling, High Speed SRAM Memory Compiler on GF22FDX+
- I3C Full Controller / Target
- I3C HCI Host Controller
Related Blogs
- TSMC Could Make Half Of Intel's Atom Output
- Intel’s Atom-based Tunnel Creek SOC with integrated PCIe interface opens new era for embedded developers
- McAfee is Intel’s Foot in the Door
- Intel's McAfee buy: Too few answers to too many questions, for now!