TSMC says equipment vendors late for 14nm
EETimes (9/7/2011 6:08 AM EDT)
TAIPEI – Time is running out to make critical decisions for how to make 14nm chips expected to hit production in 2015, and capital equipment vendors are falling behind. That was the upshot of a talk by the top R&D executive at Taiwan Semiconductor Manufacturing Co.at Semicon Taiwan here.
TSMC believes it needs to move to next-generation lithography and 450mm wafers to make 14nm chips cost effectively, but capital equipment makers threaten to miss the foundry's schedule on both fronts. "Every day we become more and more concerned," said Shang-yi Chiang, senior vice president of R&D of TSMC.
To read the full article, click here
Related Semiconductor IP
- Verification IP for C-PHY
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
Related News
- Tool vendors Synplicity Inc. and Forte Design Systems Inc. bring system-level tools to PLD masses
- EDA vendors fall short on innovation, speaker says <!-- verification -->
- Firm does marketing, sales and legal for IP vendors
- IP vendors join for one licence to 'make cores like components'
Latest News
- JEDEC Advances DDR5 MRDIMM Ecosystem with New Memory Interface Logic and Expanded MRDIMM Roadmap
- Altera Brings Determinism to Physical AI Systems with Latest Release of FPGA AI Suite
- Mosaic SoC raises $3.8M to bring real-time spatial intelligence to every consumer device
- UMC Reports First Quarter 2026 Results
- Rambus Appoints Sumeet Gagneja as Chief Financial Officer