Infineon plans €5bn 300mm fab in Dresden
By David Manners, Electronics Weekly (November 16, 2022)
Infineon is planning a €5 billion fab in Dresden if it can get government subsidies.
Building the fab is dependent on state support for the Dresden factory, said CEO Jochen Hanebeck (pictured), adding that he has received a political signal.
He has said he would like to have more capacity for products made on processes with geometries ranging fron 28nm to 12nm to reduce reliance on Taiwan foundries.
The German economy ministry says it will “quickly examine the funding possibilities for the project announced by Infineon in terms of state aid and subsidy law’.
To read the full article, click here
Related Semiconductor IP
- Band-Gap Voltage Reference with dual 2µA Current Source - X-FAB XT018
- 250nA-88μA Current Reference - X-FAB XT018-0.18μm BCD-on-SOI CMOS
- UCIe D2D Adapter & PHY Integrated IP
- Low Dropout (LDO) Regulator
- 16-Bit xSPI PSRAM PHY
Related News
- 300mm Fab Equipment Spending to Seesaw, Reach New Highs in 2021 and 2023, SEMI Reports
- 300mm Fab Spending to Boom Through 2023 With Two Record Highs, SEMI Reports
- Bosch opens wafer fab of the future in Dresden
- Global 300mm Semiconductor Fab Capacity Projected To Reach New High in 2025, SEMI Reports
Latest News
- SEMI Reports Worldwide Silicon Wafer Shipments Increase 13% Year-on-Year in Q1 2026
- POLYN Technology Announces Tapeout of Automotive Chip
- QuickLogic Establishes New Banking Relationship and Secures $10 Million Revolving Credit Facility
- TES is extending its PMU IP portfolio for X-FAB’s XT018 - 0.18µm BCD-on-SOI technology.
- RF Front-End Modules & Components IP Trends – Q1 2026 Monitoring Release