Infineon plans €5bn 300mm fab in Dresden
By David Manners, Electronics Weekly (November 16, 2022)
Infineon is planning a €5 billion fab in Dresden if it can get government subsidies.
Building the fab is dependent on state support for the Dresden factory, said CEO Jochen Hanebeck (pictured), adding that he has received a political signal.
He has said he would like to have more capacity for products made on processes with geometries ranging fron 28nm to 12nm to reduce reliance on Taiwan foundries.
The German economy ministry says it will “quickly examine the funding possibilities for the project announced by Infineon in terms of state aid and subsidy law’.
To read the full article, click here
Related Semiconductor IP
- Ultra Ethernet MAC & PCS 100G/200G/400G/800G
- Ethernet PCS 100G/200G/400G/800G/1.6T
- Ethernet MAC 100G/200G/400G/800G/1.6T
- Junction Over-Temperature Detector with Linear Centigrade-to-Voltage Output - X-FAB XT018
- Performance P570 Gen 3
Related News
- 300mm Fab Equipment Spending to Seesaw, Reach New Highs in 2021 and 2023, SEMI Reports
- 300mm Fab Spending to Boom Through 2023 With Two Record Highs, SEMI Reports
- Bosch opens wafer fab of the future in Dresden
- Global 300mm Semiconductor Fab Capacity Projected To Reach New High in 2025, SEMI Reports
Latest News
- SkyeChip Berhad Delivers 35.0% Net Profit Growth Ahead of Main Market Debut on 20 May 2026
- Quantum eMotion and JMEM TEK Sign Consortium Agreement to Accelerate Quantum-Resilient Semiconductor SoC Development
- Silvaco Announces Immediate Availability of Mixel MIPI C-PHY/D-PHY Combo IP on TSMC N2P Process
- BrainChip Strikes IP Licensing Deal with ASICLAND
- Arteris Technology Adopted by Li Auto for Intelligent Vehicles