TSMC expected to begin 20-nm line early
Peter Clarke, EETimes
4/3/2013 6:41 AM EDT
LONDON – Foundry Taiwan Semiconductor Manufacturing Co. Ltd. (Hsinchu, Taiwan) is reportedly going to start installing equipment for 20-nm CMOS production at its Fab 14 on April 20, two months earlier than previously planned.
TSMC would then be able to begin volume production at the end of the second quarter and ramp 20-nm production in the second half of 2013 a Focus Taiwan report said referencing unnamed sources.
That timetable seems extreme as it usually takes several months to get a production line hooked up and another few months for the first wafers to "pipeclean" the line. However a smooth installation could get some additional 20-nm production out in 2013.
To read the full article, click here
Related Semiconductor IP
- 12-bit, 400 MSPS SAR ADC - TSMC 12nm FFC
- 3.3V Capable GPIO on TSMC 28nm RF HPC+
- 1.2V Thin Oxide GPIO on TSMC 28nm RF HPC+
- LDO Voltage Regulator, 250 mA, TSMC N3P
- LDO Voltage Regulator, Adjustable 0.45 V to 0.9 V Output, 30 mA, TSMC N3P
Related News
- TSMC 6-inch Wafer Fab Exit Affirms Strategy Shift
- Reconfigurable semiconductor IP start-up raises $14 million - backed by 3i, Actel, HP
- Acorn reinvents itself as IP-vendor Element 14
- Acorn renamed, refocused as Element 14
Latest News
- Brite Semiconductor Releases 28nm High-Performance SAR ADC IP, Driving Upgrades for High-Speed Signal Chain Applications
- Synopsys Updates CXL IP Portfolio for AI-Era Infrastructure
- BrainChip Launches Symphony Community Akida Bundle For IBM’s Workload Management Solution
- StarIC Appoints Dr. Masum Hossain as Chief Technology Officer
- Andes Technology Empowers RISC-V Developers with Its New Streamlined IDE, RVBuilder