Semiconductor Capacity Shortages 2010
In a previous blog, Black Friday and the Predicted Semiconductor Shortages, I reported that total semiconductor manufacturing capacity is shrinking as older fabs close and new ones ramp up even slower than expected, resulting in a record reduction of total wafer capacity and silicon allocation starting in 2010. DRAM shortages and price hikes are already in place and the leading foundries are expecting a 20%+ growth rate and predicting full (95%+) capacity by the end of 2010.
Related Semiconductor IP
- TSMC 7nm 0V75 / 0V9 ESD Local Clamp – Low Cap
- TSMC 65nm 3V3 ESD Local Clamp – Rad Hard
- TSMC 5nm 1V8, 1.2V and 0.9V ESD Local Protection – Low Cap
- TSMC 3nm 3V3 ESD Local Clamp
- TSMC 3nm 1V2 ESD Local Clamp – Low Capacitance
Related Blogs
- Netbook Chip-Set Orders To Max Out Capacity At TSMC & UMC
- Advanced Fab Capacity Utilisation Tops 90%
- TSMC UMC Lead Semiconductor Recovery - Record Year in 2010
- Black Friday and the Predicted Semiconductor Shortages
Latest Blogs
- Beyond Trusted: What the NSA’s New Guidance Means for Hardware Security
- A scalable, shader-programmable vector graphics GPU core for low-power MCUs
- Navigating ISO 26262 Part 11: A Guide for Semiconductor Architects
- Embedded Security explained: Digital signatures
- Hardware security verification must go beyond functional testing