TSMC 2nm to start production in Q4 2025
By David Manners, ElectronicsWeekly (November 8, 2024)
TSMC will start producing 2nm GAA-based wafers in Q4 2025 at its Fab 20 in Hsinchu which has a capacity of 30k wpm and will be followed by the 30k wpm Fab 22 in Kaohsiung which is expected to start produxtion in Q1 2026.
Related Semiconductor IP
- Simulation VIP for Ethernet UEC
- Bluetooth® Low Energy 6.2 PHY IP with Channel Sounding
- Simulation VIP for UALink
- General use, integer-N 4GHz Hybrid Phase Locked Loop on TSMC 28HPC
- JPEG XL Encoder
Related News
- TSMC 2nm yields nearly ready for mass production
- Analog Bits to Demonstrate IP Portfolio on TSMC 3nm and 2nm Processes at TSMC 2025 Technology Symposium
- Silicon Creations Reaches Milestone of 10 Million Wafers in Production with TSMC
- Intel, TSMC to detail 2nm processes at IEDM
Latest News
- Mixel MIPI IP Integrated into Automotive Radar Processors Supporting Safety-critical Applications
- GlobalFoundries and Navitas Semiconductor Partner to Accelerate U.S. GaN Technology and Manufacturing for AI Datacenters and Critical Power Applications
- VLSI EXPERT selects Innatera Spiking Neural Processors to build industry-led neuromorphic talent pool
- SkyWater Technology and Silicon Quantum Computing Team to Advance Hybrid Quantum-Classical Computing
- Dnotitia Revolutionizes AI Storage at SC25: New VDPU Accelerator Delivers Up to 9x Performance Boost