Intel 14nm Delayed?
One of the more interesting pieces of information I overheard at SEMICON West earlier this month was that Intel 14nm was delayed. This rumor came from the semiconductor equipment manufacturers and they would know. What I was told is that the Intel 14nm process has not left the OR development facility to be replicated exactly in the OR and AZ fabs.
Process move-in is an important milestone to product launch of course. 14nm move-in was supposed to happen in Q3 but it did not. I got an update this week and was told it would “probably” not happen until Q1. The speculation is that it is a “qualification delay”.
To read the full article, click here
Related Semiconductor IP
- MIL-STD-1553 Controller IP
- UFS 5.x Device IP
- UCIe 3.x Controller IP
- Ethernet 800G PCS IP
- CHI to UCIe Bridge IP
Related Blogs
- Intel Really is Delaying 14nm Move-in. 450mm is Slipping Too. EUV, who knows?
- Yes, Intel 14nm Really is Delayed...And They Lost $600M on Mobile
- Intel 14nm versus Samsung 14nm
- Intel Shutters 14nm Fab
Latest Blogs
- CDM Dependence on Device Capacitance
- What the Cyber Resilience Act means for the future of chip design
- When Your IP Vendor Has Operated 150,000 Base Stations: Introducing Viettel Semiconductor
- Relationship between architecture and validation in system design
- The Post-Quantum Cryptography Mandate: Building Cryptographically Agile Systems for the Quantum Era