Intel 14nm Delayed?
One of the more interesting pieces of information I overheard at SEMICON West earlier this month was that Intel 14nm was delayed. This rumor came from the semiconductor equipment manufacturers and they would know. What I was told is that the Intel 14nm process has not left the OR development facility to be replicated exactly in the OR and AZ fabs.
Process move-in is an important milestone to product launch of course. 14nm move-in was supposed to happen in Q3 but it did not. I got an update this week and was told it would “probably” not happen until Q1. The speculation is that it is a “qualification delay”.
To read the full article, click here
Related Semiconductor IP
- Mesochronous Bridge for PCIe/CXL
- AI-native GPU
- OpenGMSL Verification IP
- OpenGMSL Leaf IP
- FlexGen Multi-Die Smart Network-on-Chip (NoC) IP
Related Blogs
- Intel Really is Delaying 14nm Move-in. 450mm is Slipping Too. EUV, who knows?
- Yes, Intel 14nm Really is Delayed...And They Lost $600M on Mobile
- Intel 14nm versus Samsung 14nm
- Intel Shutters 14nm Fab
Latest Blogs
- Automated, Faster Specification to Sign-Off with IDS-AI
- NovaTech Automation Crius PIU: Bringing Conventional Instrument Transformers onto the IEC 61850 Process Bus
- Single Pair Ethernet and TSN: The In-Robot Network Behind the Next Humanoid Robots
- A design path to success exists for ultra-low-voltage SoCs
- Where Routine Flow Ends Veriest Formal Expertise Begins