Intel 14nm Delayed?
One of the more interesting pieces of information I overheard at SEMICON West earlier this month was that Intel 14nm was delayed. This rumor came from the semiconductor equipment manufacturers and they would know. What I was told is that the Intel 14nm process has not left the OR development facility to be replicated exactly in the OR and AZ fabs.
Process move-in is an important milestone to product launch of course. 14nm move-in was supposed to happen in Q3 but it did not. I got an update this week and was told it would “probably” not happen until Q1. The speculation is that it is a “qualification delay”.
To read the full article, click here
Related Semiconductor IP
- TSMC 7nm 0V75 / 0V9 ESD Local Clamp – Low Cap
- TSMC 65nm 3V3 ESD Local Clamp – Rad Hard
- TSMC 5nm 1V8, 1.2V and 0.9V ESD Local Protection – Low Cap
- TSMC 3nm 3V3 ESD Local Clamp
- TSMC 3nm 1V2 ESD Local Clamp – Low Capacitance
Related Blogs
- Intel Really is Delaying 14nm Move-in. 450mm is Slipping Too. EUV, who knows?
- Yes, Intel 14nm Really is Delayed...And They Lost $600M on Mobile
- Intel 14nm versus Samsung 14nm
- Intel Shutters 14nm Fab
Latest Blogs
- Beyond Trusted: What the NSA’s New Guidance Means for Hardware Security
- A scalable, shader-programmable vector graphics GPU core for low-power MCUs
- Navigating ISO 26262 Part 11: A Guide for Semiconductor Architects
- Embedded Security explained: Digital signatures
- Hardware security verification must go beyond functional testing