Intel's Ivy Bridge delayed says senior executive
Sylvie Barak, EETimes
2/26/2012 6:28 PM EST
BARCELONA—A senior Intel Corp. executive has admitted that its next generation Ivy Bridge microprocessor will be delayed by around eight to 10 weeks to be launched in June.
Sean Maloney, executive vice-president of Intel and chairman of Intel China told the Financial Times that the 22-nm processor would now not be shipping in April as had widely been expected by analysts.
To read the full article, click here
Related Semiconductor IP
- Multi-channel Ultra Ethernet TSS Transform Engine
- Configurable CPU tailored precisely to your needs
- Ultra high-performance low-power ADC
- HiFi iQ DSP
- CXL 4 Verification IP
Related News
- Intel Ivy Bridge CPUs may launch in March
- UBM TechInsights takes first look inside Intel's latest Ivy Bridge processor
- New PCI bridge and memory controller cores take connectivity to board level for user-customizable processor
- Altera builds on-chip bridge to link interfaces
Latest News
- Quintauris Secures Capital Increase to Accelerate RISC-V Adoption
- MIPI Alliance Releases UniPro v3.0 and M-PHY v6.0, Accelerating JEDEC UFS Performance for Edge AI in Mobile, PC and Automotive
- Marvell to Showcase PCIe 8.0 SerDes Demonstration at DesignCon 2026
- Embedded FPGA reaches a new stage of industrial maturity – Menta at Embedded World 2026
- Fraunhofer IPMS collaborates with Korean TSN Lab to further develop IP solutions for automotive and industrial connectivity