In-situ Monitors IP platform for a real time control of Timing critical paths
Meerkat is an in-situ Monitors IP platform for a real time control of Timing critical paths, Activity critical paths or User defi…
Overview
Meerkat is an in-situ Monitors IP platform for a real time control of Timing critical paths, Activity critical paths or User defined critical path in digital electronic device. Meerkat, non-intrusive digital elements based on standard cell libraries, are inserted seamlessly in the design of digital devices with standard EDA tools. From user defined monitoring criteria, Meerkat enables ultra-fast Short loop for Fail Safe Operational mode, Fast loop for Adaptive Voltage-Scaling (AVS) or Body-Bias (ABB) & Real-time reliability reporting for silicon Lifecycle analytics to protect, control your device and report any deviation of your device during its entire lifetime. cell libraries, are inserted seamlessly in the design of digital devices with standard EDA tools. From user defined monitoring criteria, Meerkat enables ultra-fast Short loop for Fail Safe Operational mode, Fast loop for Adaptive Voltage-Scaling (AVS) or Body-Bias (ABB) & Real-time reliability reporting for silicon Lifecycle analytics to protect, control your device and report any deviation of your device during its entire lifetime.
Key features
- One solution for multi applications in-situ monitoring
- Instant thermal protection
- Direct parametric reading through real path monitoring
- Native aging monitoring
- Native enabling of voltage scaling and biasing
- Reporting of in-chip placement and Alarm & Status outputs of in-situ monitors.
Block Diagram
Benefits
- Instant thermal protection
- Direct parametric reading through real path monitoring
- Native aging monitoring
- Native enablement of voltage scaling and biasing
- Reporting of in-chip placement and Alarm & Status outputs of in-situ monitors.
Specifications
Identity
Files
Note: some files may require an NDA depending on provider policy.
Provider
Learn more about Reliability Monitor IP core
Paving the way for the next generation audio codec for the True Wireless Stereo (TWS) applications - PART 1 : TWS challenges explained
Breaking new energy efficiency records with advanced power management platform
Synopsys Expands Collaboration with Arm to Accelerate the Automotive Industry’s Transformation to Software-Defined Vehicles
Role of Embedded Systems and its future in Industrial Automation
Digital Power Control Highlights
Frequently asked questions about Reliability Monitor IP cores
What is In-situ Monitors IP platform for a real time control of Timing critical paths?
In-situ Monitors IP platform for a real time control of Timing critical paths is a Reliability Monitor IP core from Dolphin Semiconductor listed on Semi IP Hub.
How should engineers evaluate this Reliability Monitor?
Engineers should review the overview, key features, supported foundries and nodes, maturity, deliverables, and provider information before shortlisting this Reliability Monitor IP.
Can this semiconductor IP be compared with similar products?
Yes. Buyers can compare this product with similar semiconductor IP cores or IP families based on category, provider, process options, and structured technical specifications.